Manipur's Energy Share from NER Generating
Stations
State Share for Power Drawal
:
The generations of all the Central
Sector Power Projects of North Eastern Region are
shared among the N.E. States as per the allocation made
by the Government of India after deducting 15% as
unallocated share. The allocated share of Manipur for
power drawal from the Central Sector Generating
Stations of this region is as given below.
State Share for Power Drawal
| Sl. No. |
Name of Project |
Installed capacity |
Share of Manipur |
| MW |
% |
MW |
| 1.
| Loktak Hydro Electric Project (NHPC), (Manipur) |
105 |
28.95 (32.52) |
34.15 |
| 2. |
Kopili-Khandong Hydro Electric Project (NEEPCO),
(Assam & Meghalaya) |
250 |
6 (9.75) |
24.38 |
| 3. |
AGBPP, Kathalguri (NEEPCO), (Assam) |
291 |
6.87 (10.65) |
31.00 |
| 4. |
AGTPP, Ramchandranagar(NEEPCO), (Tripura) |
84 |
7 (10.50) |
8.82 |
| 5. |
Ranganadi HE Project, (Arunachal Pradesh) |
270 |
7.16 (10.86) |
29.33 |
| 6. |
Doyang HE Project, (Nagaland) |
75 |
6.7 (10.35) |
7.76 |
| Total |
|
|
135.44 MW |
Note : The figures in the brackets are
including allocation made from time to time from the unallocated
shares (unallocated share of 15%). The total share shown above is
based on the total installed capacity. But the actual generation
is much less so the actual share is usually less than total
share indicated above.
Source-wise Energy Drawn and Rates :
The source-wise energy drawn from the Central Sector Generating
Stations of this region and the rates charged during 2002-03
is as given below.
Energy Drawn During 2002-03
| Sl. No. |
Name of organisation |
Energy Drawal (MU) |
Rate per Unit in paise |
| 1. |
NEEPCO
: |
| A |
Kopili-Khandong Hydro Electric
Project |
101.844 |
69.8 paise |
| B |
Agartala Gas Turbine Power Project |
60.466 |
190.0 Paise |
| C |
Assam Gas Based Power Project |
121.757 |
225.0 Paise |
| D |
Doyang Hydro Electric Project |
11.433 |
137.5 Paise |
| E |
Ranganadi Hydro Electric Project |
19.059 |
152.0 Paise |
| Sub-total
: |
314.560 |
|
| 2. |
NHPC (Loktak Hydro
Electric Project) : |
Two-part Tariff |
| Free Power |
65.647 |
| Purchased |
108.373 |
| Sub-total:
|
174.020 |
|
| 3. |
Eastern Regional Grid |
4.251 |
Yet to be intimated by NEREB |
| Total:
|
492.831 |
|
| Transmission Tariff
(UCPTT) charged by Power Grid
Corporation of India (PGCI) |
35.0 Paise |
Transmission Charge   :
The cost of transmitting the energy indicated above is 35 paise
per unit. NEREB has pegged the transmission tariff in NER at 35 paise
per unit inspite of the fact that the transmission cost has increased
drastically due addition of more new transmission lines by Powergrid
in the NER.
|